Cooling Load Calculation: Formulas, Units and a Worked Example

A cooling load calculation adds up every source of heat entering a space (conduction through the envelope, solar gain, people, lights, equipment, air leakage and ventilation air) and expresses the total as a rate in Btu/h, kW or tons. Cooling capacity is the other side of the equation: what the equipment can remove. This guide gives you the formulas, the unit conversions, a worked example and the point where a rule of thumb stops being good enough. The heat paths are conduction, convection and radiation, so a single workbook that models all three, like the Jewlz Engineering Toolkit, is a natural place to run the numbers.
TL;DR
Cooling load is the heat you must remove per unit time to hold temperature and humidity. Cooling capacity is what the equipment can remove under stated conditions. Size capacity to the load, never the reverse.
Sum four groups of heat gain: external (envelope), internal (people, lights, equipment), infiltration and system components such as fans and ducts.
Core airside equations: sensible = 1.08 × CFM × ΔT, latent = 4840 × CFM × ΔW, and 1 ton = 12,000 Btu/h = 3.516 kW.
Square-foot-per-ton rules give a preliminary estimate only. Final loads follow ASHRAE Handbook methods or ACCA Manual J.
Heat paths are conduction, convection and radiation, so a spreadsheet model with all three and a material database speeds up the work.
Table of Contents
Cooling load versus cooling capacity
The two terms get swapped constantly, and the error leads to wrong equipment. ASHRAE’s terminology defines cooling load as the amount of cooling per unit time required by the conditioned space or product. Cooling capacity is the design maximum rate at which equipment removes heat from a fluid under specified operating conditions.
The load belongs to the space. The capacity belongs to the machine. ACCA’s definition is the same idea in plainer words: load is what a building needs, capacity is what a piece of equipment can provide. The design cooling load is the one at summer design conditions. ACCA’s example is Atlanta at 92°F outdoors and 75°F indoors.
Capacity ratings are quoted at a test condition. Your design day is usually hotter, so the equipment delivers less than its label on the day that matters. ACCA’s design article makes the same point: the load calculation is the first step, and sizing also depends on equipment type, efficiency, the sensible and latent split, and the gap between design and rating conditions.

Where cooling load comes from
ASHRAE Handbook Fundamentals Chapter 18 sorts cooling-load contributors into four groups:
Group | Examples |
External | Walls, roofs, windows, skylights, doors, partitions, ceilings, floors |
Internal | Lights, people, appliances, equipment |
Infiltration | Air leakage and moisture migration |
System | Outdoor air, duct leakage and heat gain, reheat, fan and pump energy, energy recovery |
Two terms matter for everything that follows. Sensible load changes air temperature. Latent load is the moisture the coil must condense. A Minnesota study of home cooling loads notes that sensible load depends on U-value, solar radiation, infiltration, ventilation, occupants, equipment and lights, while latent load is driven by infiltration and moisture-generating activities such as cooking and breathing.
Chapter 18 also separates four time-varying quantities. Space heat gain is the rate heat enters or is generated in the space. Radiant heat gain is absorbed by surfaces and released to the air later. Space cooling load is the rate at which sensible and latent heat must be removed to hold conditions. Cooling coil load is the space load plus system loads such as fan heat, duct gain and outdoor-air heat and moisture.
That delay is why the sum of instantaneous gains at a given hour does not equal the cooling load at that hour. Radiant energy is stored in the building mass first. For a zoned system, total capacity need not exceed the largest hourly sum of simultaneous zone loads, but each zone must be able to handle its own peak at its own peak hour.
The formulas, variable by variable
Conduction through walls, roofs and glass
For opaque surfaces the cooling load temperature difference (CLTD) method uses Q = U × A × CLTD. Q is in Btu/h, U is the overall heat transfer coefficient in Btu/h·ft²·°F, A is the area in ft², and CLTD is a tabulated equivalent temperature difference that already accounts for solar effect and thermal storage. PDHonline course M378 gives the correction CLTD_corrected = CLTD + (78 − TR) + (TM − 85), with the base values taken from ASHRAE Fundamentals tables. Here TR is the room temperature and TM is the mean outdoor temperature.
Example: a 100 ft² wall section with U = 0.30 and a corrected CLTD of 25°F contributes 0.30 × 100 × 25 = 750 Btu/h. Both numbers are illustrative.
If you want the physics behind U, film coefficients and radiation exchange, our heat transfer model guide walks through the methods and math. For the solar term specifically, see solar heat gain modeling.
Air-side equations
Once you know how much air you move and the conditions on each side of the coil, the standard equations from the PDHonline M196 course apply:
Sensible: Q_s = 1.08 × CFM × (To − Tc), in Btu/h with temperatures in °F
Latent: Q_l = 4840 × CFM × (Wo − Wc), with humidity ratio W in lb water per lb dry air
Total: Q_t = 4.5 × CFM × (ho − hc), with enthalpy h in Btu/lb
The constants come from standard air at 60°F and 14.7 psia, a density of 0.075 lb/ft³ and a latent heat of water of 1,060 Btu/lb, as the HVAC rules-of-thumb reference explains. The factor 1.08 is not universal. At high altitude or very different air temperature the density changes and so does the constant.
In SI, the ASHRAE example room uses qs = 1.23 × Qs × Δt and ql = 3010 × Qs × ΔW, with airflow Qs in L/s and results in watts.
Ventilation and infiltration airflow
The same course material, PDHonline M378, gives three quick ways to estimate outdoor air:
Air change method: V = ACH × A × H / 60, in CFM, with floor area A and height H. Infiltration is typically 0.15 to 0.5 ACH at winter design.
Crack method: V = I × A, with I about 0.15 CFM/ft² of crack area.
Occupancy method: V = N × 20 CFM per person, following ASHRAE 62.
Those ventilation CFM values feed straight into the sensible and latent equations above.
Converting load to Btu/h, kW and tons
One ton of refrigeration is defined as 12,000 Btu/h, which is 3.516 kW or 3,024 kcal/h, per PDHonline M378. Its origin is the rate that freezes one ton of water at 0°C in 24 hours.
From | To | Multiply by |
Btu/h | tons | 1 / 12,000 |
tons | kW | 3.516 |
Btu/h | kW | about 0.000293 (3.516 / 12,000) |
kW | Btu/h | about 3,412 (12,000 / 3.516) |
A calculated load of 31,000 Btu/h is 2.58 tons, or 9.08 kW. A nominal 3-ton label is a convention, not a guarantee of 36,000 Btu/h at your design day.
A worked example: 1,000 sq ft office
Step 1, preliminary estimate. The rules-of-thumb reference lists offices and commercial space at 300 to 400 sq ft per ton, or 30 to 40 Btu/h per sq ft. For 1,000 sq ft that is 30,000 to 40,000 Btu/h, or roughly 2.5 to 3.3 tons.
Step 2, airflow. The same reference gives about 400 CFM per ton at a 20°F air temperature difference, with a ±20% range. At 3 tons that is about 1,200 CFM.
Step 3, sensible capacity of that air. With a 75°F room and 55°F supply air:
Q_s = 1.08 × 1,200 × 20 = 25,920 Btu/h
Step 4, latent capacity. Assume a humidity ratio difference of 0.0015 lb/lb across the coil:
Q_l = 4840 × 1,200 × 0.0015 = 8,712 Btu/h
Step 5, total and conversion. 25,920 + 8,712 = 34,632 Btu/h, which is about 2.89 tons or 10.1 kW. That sits inside the preliminary range, as it should, since the inputs were chosen to be typical. In a real project, each input comes from the load calculation, not from an assumed airflow.
For a residential 1,000 sq ft space, the rule of thumb is 500 to 700 sq ft per ton, or 17 to 24 Btu/h per sq ft. That is about 1.4 to 2 tons. The spread between office and home shows how much occupancy and equipment drive the answer.

Full method for a design-grade calculation
When the number has to hold up, follow the sequence of the ASHRAE radiant time series procedure as laid out in the ASHRAE example room:
Calculate the 24-hour profile of heat gains for each component on the design day.
Split each gain into radiant and convective parts.
Apply the radiant time series to the radiant part to account for the time delay.
Sum the convective gain and the delayed radiant gain for each hour, and find the peak.
Other accepted methods include TETD/TA, CLTD/CLF, the transfer function method, heat balance, and ACCA Manual J and Manual N, as listed in PDHonline M196. Pick the one your code or client requires.
Two cautions apply. First, if cooling is delivered mostly by radiant surfaces, the conversion of heat gain to cooling load differs from an all-air system. ASHRAE notes that room loads then have to be translated to system loads using different principles. Second, add system loads (fan heat, duct gain, outdoor air) to get the coil load, not just the space load.
Where the rule of thumb breaks
The square-foot-per-ton method is useful for schematic design, cost estimates and sanity checks. The rules-of-thumb reference says it is for preliminary design only and that construction documents should use the ASHRAE Handbook of Fundamentals. PDHonline M196 lists what it ignores: orientation, the surface-area difference between one- and two-story buildings, insulation, air leakage and occupancy.
Move to a calculation when you see any of these:
Large glazed areas or strong west or south exposure
Dense equipment or occupancy
Humid climates where the latent share is large
Unusual enclosures such as server rooms, labs or process spaces
For the last case, we have written separate guides on data center cooling load and server rack cooling. If you are comparing approaches to removing the heat once you know it, the active cooling systems guide covers the options.
Doing the math in one workbook
A cooling load is a heat transfer problem with many small terms. Each wall needs a U-value, each glazing a solar term, each material a conductivity or density, and the temperatures change across the day. Errors usually come from inconsistent units and from property values pulled from different tables.
The Jewlz Engineering Toolkit is an Excel-based tool that combines conduction, convection and radiation models with a built-in material property database. It supports variable material properties and a wide temperature range, so you can keep the envelope, the enclosure and the equipment heat paths in one calculation set rather than in separate sheets. For a deeper look at inputs, outputs and sanity checks on a thermal model, read our building thermal simulation guide.
Our view
Most cooling load mistakes we see discussed are not formula mistakes. They are bookkeeping mistakes: a U-value from one table, a conductivity from another, a temperature in the wrong unit, a radiant gain treated as if it hit the air at once. That is why we built our toolkit around the three heat transfer modes in one place. Conduction, convection and radiation are not separate topics when you size cooling. They are the same heat moving along different paths, and the numbers are easier to trust when they share one property database and one set of assumptions. Our positioning is simple: professional thermal and CFD analysis should not depend on a licence budget. Basic tools are free, and students and small teams can run real calculations. Use the quick equations to get oriented, then run the detailed numbers where you can trace every input. Joel
Run your own numbers with the toolkit
If you are sizing cooling for an enclosure, a room or a piece of equipment, the Jewlz Engineering Toolkit lets you work through conduction, convection and radiation with a built-in property database in a downloadable Excel-based tool. Start at the Jewlz Engineering Toolkit page, or see the thermal analysis tools for heat transfer work.

For airflow-driven problems, the CFD simulation tools extend the same analysis to fluid flow.
FAQ
How do you calculate cooling capacity?
Cooling capacity equals the load you must meet, adjusted for the conditions the equipment really operates in. Start from the design cooling load in Btu/h, then compare it with the equipment’s capacity at the same outdoor and indoor conditions, not with its nominal label. Check total, sensible and latent capacity separately, because they are not interchangeable.
How many tons of cooling do I need for 1,000 square feet?
As a preliminary estimate, about 2.5 to 3.3 tons for office or commercial space and about 1.4 to 2 tons for residential space. These come from rules of thumb, so orientation, insulation, glazing, leakage and occupancy can move the answer a lot. A full load calculation gives the number to design to.
What is the cooling load formula?
There is no single formula. Conduction uses Q = U × A × CLTD, and air streams use Q_s = 1.08 × CFM × ΔT and Q_l = 4840 × CFM × ΔW. You sum every contribution across the envelope, internal gains, infiltration and system components. The total, converted at 12,000 Btu/h per ton, gives the size.
How do you calculate airflow for cooling?
A common rule is about 400 CFM per ton at a 20°F air temperature difference. For a precise value, rearrange the sensible equation: CFM = Q_s / (1.08 × ΔT). A 25,920 Btu/h sensible load at 20°F gives 1,200 CFM.
Is the rule of thumb good enough?
It is good enough for early estimates and budgeting. For construction documents, the reference sources say to use the ASHRAE Handbook of Fundamentals methods or ACCA Manual J.
Sources
Recommended


Comments